Objective:
1. To study the synchronisation of the given synchronous generator with the main
busbars by Three-Dark-lamp method.
2. To study the effect of the change in input to the alternator (under constant
excitation) on output power, power angle and power factor.
Theory:
The synchronous generator (FIG.1) can be connected to the busbars (represented by
an equivalent generator) only when each of the voltages between R1 and R2,
between Y1 and Y2, and between B1 and B2 is zero at every instant of time. This
condition is fulfilled when the line voltages on the generator side are equal, at all
instants of time, to the corresponding voltages on the busbar side. This is possible
only if the following conditions are fulfilled:
a. The voltages Vg and Vb are equal in magnitude and are in phase.
b. Their frequencies are the same.
c. The generator and the busbars have the same phase sequence.
When these conditions are fulfilled, the synchronising switch between the generator
and the bus can be switched on. Fulfilment of these conditions is checked by the
following method:
I. Synchronisation by three dark lamp method
Connect the D.C. motor -synchronous generator as shown in FIG.2. Start the D.C.
motor by switching on S1 and bring its speed to the synchronous speed of the
generator (1500-rpm). Adjust the field excitation of the generator using Rf2 and Rf3 so that about rated voltage (400V, L-L) is obtained. Switch on the a.c mains switc S2 and adjust the variac so that Vb is 400 V. Let the phase sequence of the
generator terminals RYB be the same as that of the respective terminals of the
mains, RYB. The voltage phasors for this condition are shown in FIG.3.If the
generator frequency is slightly more than that of the bus, then the phasors R1, Y1
and B1 move anti-clockwise relative to R2, Y2, and B2. The voltages across the
lamps L1, L2, L3 (which are indicated by the phasors R1R2, Y1Y2, and B1B2) will
increase & decrease simultaneously and therefore, the three lamps will brighten up and darken at the same time. If the phase sequences are R1Y1B1 and R2 B2Y2, the phase diagram of voltages will be as shown in FIG.4. For this condition the voltages across lamps given by phasors R1R2, Y1Y2 and B1B2 are not equal to each other at the instant shown. Therefore the lamps go through their zero voltage one after the other. The phase sequences are thus different and can be corrected by interchanging any two terminals either on the generator side or on the bus side. When such a change is made both the three-phase main switch S2 and he D.C. main switch S1 should be switched off.
With the phase sequence corrected, if there is a large difference between the
frequency of the generator and that of the bus, the lamps will brighten & darken in quick succession. By adjusting the speed of the generator, this rapidity can be
reduced, which indicates that the frequencies are coming closer and the lamps will brighten up & darken slowly.
The correct moment of synchronisation in this method is when all the lamps are
completely dark, at which time all the voltages of her bus are exactly in phase with the corresponding voltages of the generator. At this moment the synchronising switch S3 is closed and the generator is synchronised with the mains.
After synchronisation do not allow the synchronous machine to run as a motor, i.e.
do not allow the wattmeter to read negative. If it reads negative it means that the
machine receives power from the a.c mains. In such a case, reduce the excitation of the D.C. motor so that the wattmeter reads a few positive watts.
II. Study of the influence of the change in input power of the synchronous
generator
After synchronisation If is kept constant and the prime -mover excitation Ifpm is
slowly decreased taking care that the positive power is shown by the wattmeter
which indicates that the machine is only generating. For each value of Ifpm, Ia, W, V, and the power angle are noted. The power angle may be noted using a
stroboscope. The generator may become unstable for higher values of current; care should be taken to switch off the a.c mains then.
Load of suitable values is connected to the D.C. busbar to absorb the D.C. power in the event the synchronous machine operates as a motor. This load is switched on before synchronisation.
Home electrical synchronization tutorial 3 dark lamp method
Subscribe to:
Post Comments
(
Atom
)
This is a topic which is close to my heart... Many thanks!
ReplyDeleteExactly where are your contact details though?
Here is my web blog : Buffet lamps
bear grylls messer
ReplyDeleteHere is my weblog ; bear grylls messer
Hi, I do think this is a great web site. I stumbledupon it ;) I will
ReplyDeletecome back yet again since i have bookmarked it. Money and freedom is the greatest way to change,
may you be rich and continue to guide others.
My website - google adwords
Very shortly this web site will be famous among all
ReplyDeleteblogging and site-building users, due to it's pleasant content
my page :: backlinks erstellen
Hmm it looks like your website ate my first comment (it was extremely
ReplyDeletelong) so I guess I'll just sum it up what I had written and say, I'm thoroughly enjoying your blog.
I as well am an aspiring blog blogger but I'm still new to everything. Do you have any recommendations for first-time blog writers? I'd certainly appreciate it.
My homepage ... Best online backup services
Appreciate this post. Let me try it out.
ReplyDeletemy web site: Green coffee bean extract
my webpage - Green coffee bean extract
I have been meaning to write something like this on my website and you have given me an idea. Cheers.
ReplyDeleteSelenium training in Chennai
Selenium training in Bangalore
Selenium training in Pune
Selenium Online training
Well somehow I got to read lots of articles on your blog. It’s amazing how interesting it is for me to visit you very often.
ReplyDeletePython Online certification training
python Training institute in Chennai
Python training institute in Bangalore
The article is so informative. This is more helpful for our
ReplyDeletesoftware testing training online
best selenium online training in chennai. Thanks for sharing
This comment has been removed by the author.
ReplyDeleteVisit Here -> BIG DATA AND HADOOP TRAINING IN BANGALORE
ReplyDeleteVisit here -> Devops Training in Bangalore
ReplyDeleteFor Data science training in Bangalore, Visit:
ReplyDeleteData Science training in Bangalore
Thanks for your valuable post... The data which you have shared is more informative for us...
ReplyDeleteaws Training in Bangalore
python Training in Bangalore
hadoop Training in Bangalore
angular js Training in Bangalore
bigdata analytics Training in Bangalore
I got useful information by reading this blogs
ReplyDeleteaws Training in Bangalore
python Training in Bangalore
hadoop Training in Bangalore
angular js Training in Bangalore
bigdata analytics Training in Bangalore
python Training in Bangalore
aws Training in Bangalore